خلاصه معدن به دو زبان
About Project
Chahfiroozeh Copper Concentrator Plant (Feed of 7,000,000 tonnes per year)
- Feed 7 million tonnes per year of sulfide copper ore
- Product 100,000 tonnes concentrate with the grade of 25%
- Water consumption 75 liter per second( considering using filter press for dewatering)
- Power consumption 38 MW
- Employment 337 people (Operation) and 167 people (administration)
B) Below activities was done up to this stage:
- Drilling of about 69,000 meters of exploration bore holes.
- Pre-feasibility study
- Pre- stripping of about 50 million tonnes of waste until the end of 2015
- Mineral processing test which was done by Zarfaravar Company (Iranian company)
- Mineral processing test which was done by S.G.S
- Basic engineering of the concentration plant was done by FLSmidth Co.
- Basic engineering of the dewatering plant was done by Paterson & Cooke
- Price enquiry for dewatering equipment from Outotec, Tenova, Ishigaki and Bilfinger (based on the test works which was done on the tail)
- Feasibility study of the project
- Signing the contract with Aria Jonoob company for pre-stripping of about 10 million tonnes per year until 2019
- Beginning the geotechnical studies by Zamiran Co.
- Site selection for primary crusher, grinding and flotation plant, tail dewatering, water reservoirs and electrical substation
- Determination of the best route for transferring the power to the plant from 400KVA Khatoonabad post
- Price enquiry for transferring the power to the plant
- Determination of the best route for transporting the tail from concentration plant to dewatering plant
- Determination of the best route to access min and concentration plant
- Preparation of the prequalification document for selecting the EPCF Contractor
- Preparation of the tender document for selecting the EPCF Contractor